You are here:
  1. Homepage
  2. »
  3. Indonesia
  4. »
  5. East Java
  6. » Raci Kulon
Indonesia Flag Icon

Raci Kulon Destination Guide

Explore Raci Kulon in Indonesia

Raci Kulon in the region of East Java is a town in Indonesia - some 395 mi or ( 635 km ) East of Jakarta , the country's capital city .

Interactive map of Raci Kulon

Current time in Raci Kulon is now 08:14 PM (Wednesday) . The local timezone is named " Asia/Jakarta " with a UTC offset of 7 hours. Depending on the availability of means of transportation, these more prominent locations might be interesting for you: Ujungpangkah, Tulungagung, Tuban, Surabaya, and Singaraja. Since you are here already, make sure to check out Ujungpangkah . We saw some video on the web . Scroll down to see the most favourite one or select the video collection in the navigation. Where to go and what to see in Raci Kulon ? We have collected some references on our attractions page.


Videos

Wisata Bahari Lamongan (WBL) - East Java

2:01 min by eastjavadotcom
Views: 33248 Rating: 5.00

Lamongan Regency is one of tourism place in East Java, which has potency of nature, culture and tourism attraction that be able to expose the completely tourism enchantment (The East Java Natural Ench ..

Tahu Campur - Lamongan - East Java

2:20 min by eastjavadotcom
Views: 18333 Rating: 4.00

Tahu campur or Mix Tofu is such an icon for Lamongan. As mentioned, the main ingredient from this food is must be tofu, but sometimes tofu itself is not dominate the whole component from this food, to ..


Wisata Bahari Lamongan - East Java

2:06 min by eastjavadotcom
Views: 10423 Rating: 0.00

Lamongan Marine Tourism (WBL) is available with its unique, the result of combination between natural aspects, cultures, and architecture, which is global, taste but still maintain local trademark. WB ..

Traditional Soto Lamongan - East Java

2:04 min by eastjavadotcom
Views: 9603 Rating: 4.20

Soto lamongan is different with any other Soto. Soto Lamongan is the only Soto which using Koya or some kind of garlic powder. The side dish for this food is chicken, that is a free-range chicken, whi ..


Videos provided by Youtube are under the copyright of their owners.


Interesting facts about this location

Surajaya Stadium

Surajaya Stadium is a multi-use stadium in Lamongan, East Java, Indonesia. It is currently used mostly for football matches and is used as the home stadium for Persela Lamongan. The stadium has a capacity of 25,000 people.

More reading: Wikipedia Article
Located at -7.11 112.43 (Lat./Long.); Less than 18 km away
Tags: Football venues in Indonesia, Sports venues in Indonesia

Maharani Cave

Maharani cave is a phosphate mining cave located at Paciran, a sub district of Lamongan, Indonesia. At depth 25 meters, the cave has 2,500 square metres wide underground area.

More reading: Wikipedia Article
Located at -7.12 112.42 (Lat./Long.); Less than 19 km away
Tags: Caves of Indonesia

Raid on Griessie

The Raid on Griessie was a British attack on the Dutch port of Griessie (later renamed Gresik) on Java in the Dutch East Indies in December 1807 during the Napoleonic Wars. The raid was the final action in a series of engagements fought by the British squadron based in the Indian Ocean against the Dutch naval forces in Java, and it completed the destruction of the Dutch squadron with the scuttling of two old ships of the line, the last Dutch warships in the region.

More reading: Wikipedia Article
Located at -7.14 112.65 (Lat./Long.); Less than 20 km away
Tags: 1807 in Asia, Conflicts in 1807, Military raids, Naval battles involving the Netherlands, Naval battles involving the United Kingdom, Naval battles of the Napoleonic Wars

Madura Strait

Madura Strait is a stretch of water that separates the Indonesian islands of Java and Madura. The islands of Kambing, Giliraja, Genteng, and Ketapang lie in the Strait. The Suramadu Bridge, the longest in Indonesia, spans the strait between Surabaya on Java and Bangkalan on Madura.

More reading: Wikipedia Article
Located at -7.13 112.68 (Lat./Long.); Less than 20 km away
Tags: East Java, Madura Island, Straits of Indonesia

Petrokimia Stadium

Petrokimia Stadium (also known as Tri Dharma Stadium) is a multi-use all-seater stadium in Gresik, Indonesia. It has a capacity of 25,000 people and is the home of Gresik United (formerly known as Petrokimia Putra).

More reading: Wikipedia Article
Located at -7.16 112.64 (Lat./Long.); Less than 21 km away
Tags: Football venues in Indonesia, Rugby union stadiums in Indonesia, Sports venues in Indonesia

Historical Weather

temperature and rainfall during the year in Raci Kulon